Beverage Campaign Project Report

After looking back on the project,  I believe there are two main reasons why it did not get finished; one was with the project itself and one was with me.

the first reason is that the beverage campaign and midterm were assigned at the same time.  This essentially pared down the four weeks originally budgeted for this project into two. Perhaps if the specs for the midterm were posted on the class blog at the beginning of the semester or the beverage project had been posted later, I believe it would have assisted with the completion of the project.

The other reason the project did not get finished was that, during midterm break, my priorities got switched.  I worked on this project instead of working on another project and getting it out of the way.  This lead to the other project mentioned consuming the grand majority of the time after spring brake, and the incompletion of the project.  in the future i will be much more carful in my assessment of my priorities so this does not happen again.

If both of these had been addressed, the project scheduling and my priority assessment, that the chances of the project being completed would have been vary high.